Terminology
This
page
is
part
of
the
FHIR
Specification
(v4.0.1:
R4
(v5.0.0:
R5
-
Mixed
Normative
and
STU
)
).
This
is
the
current
published
version
in
it's
permanent
home
(it
will
always
be
available
at
this
URL).
The
current
version
which
supercedes
this
version
is
5.0.0
.
For
a
full
list
of
available
versions,
see
the
Directory
of
published
versions
.
Page
versions:
R5
R4B
R4
R3
| Clinical Decision Support Work Group | Maturity Level : N/A | Standards Status : Informative |
Raw JSON ( canonical form + also see JSON Format Specification )
Definition
for
Code
System
ActionRelationshipType
SystemActionRelationshipType
{
"resourceType" : "CodeSystem",
"id" : "action-relationship-type",
"meta" : {
"lastUpdated" : "2019-11-01T09:29:23.356+11:00"
"lastUpdated" : "2023-03-26T15:21:02.749+11:00",
"profile" : ["http://hl7.org/fhir/StructureDefinition/shareablecodesystem"]
},
"text" : {
"status" : "generated",
"div" : "<div>!-- Snipped for Brevity --></div>"
"div" : "<div xmlns=\"http://www.w3.org/1999/xhtml\"><p>This code system <code>http://hl7.org/fhir/action-relationship-type</code> defines the following codes:</p><table class=\"codes\"><tr><td><b>Lvl</b></td><td style=\"white-space:nowrap\"><b>Code</b></td><td><b>Display</b></td><td><b>Definition</b></td></tr><tr><td>1</td><td style=\"white-space:nowrap\">before<a name=\"action-relationship-type-before\"> </a></td><td>Before</td><td>The action must be performed before the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0before-start<a name=\"action-relationship-type-before-start\"> </a></td><td>Before Start</td><td>The action must be performed before the start of the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0before-end<a name=\"action-relationship-type-before-end\"> </a></td><td>Before End</td><td>The action must be performed before the end of the related action.</td></tr><tr><td>1</td><td style=\"white-space:nowrap\">concurrent<a name=\"action-relationship-type-concurrent\"> </a></td><td>Concurrent</td><td>The action must be performed concurrent with the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0concurrent-with-start<a name=\"action-relationship-type-concurrent-with-start\"> </a></td><td>Concurrent With Start</td><td>The action must be performed concurrent with the start of the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0concurrent-with-end<a name=\"action-relationship-type-concurrent-with-end\"> </a></td><td>Concurrent With End</td><td>The action must be performed concurrent with the end of the related action.</td></tr><tr><td>1</td><td style=\"white-space:nowrap\">after<a name=\"action-relationship-type-after\"> </a></td><td>After</td><td>The action must be performed after the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0after-start<a name=\"action-relationship-type-after-start\"> </a></td><td>After Start</td><td>The action must be performed after the start of the related action.</td></tr><tr><td>2</td><td style=\"white-space:nowrap\">\u00a0\u00a0after-end<a name=\"action-relationship-type-after-end\"> </a></td><td>After End</td><td>The action must be performed after the end of the related action.</td></tr></table></div>"
},
"extension" : [{
"url" : "http://hl7.org/fhir/StructureDefinition/structuredefinition-wg",
"valueCode" : "cds"
},
{
"url" : "http://hl7.org/fhir/StructureDefinition/structuredefinition-standards-status",
"valueCode" : "trial-use"
},
{
"url" : "http://hl7.org/fhir/StructureDefinition/structuredefinition-fmm",
"valueInteger" : 2
"valueInteger" : 3
}],
"url" : "http://hl7.org/fhir/action-relationship-type",
"identifier" : [{
"system" : "urn:ietf:rfc:3986",
"value" : "urn:oid:2.16.840.1.113883.4.642.4.814"
},
{
"use" : "old",
"system" : "urn:ietf:rfc:3986",
"value" : "urn:oid:2.16.840.1.113883.4.642.1.797"
}],
"version" : "4.0.1",
"version" : "5.0.0",
"name" : "ActionRelationshipType",
"title" : "ActionRelationshipType",
"status" : "draft",
"title" : "Action Relationship Type",
"status" : "active",
"experimental" : false,
"date" : "2019-11-01T09:29:23+11:00",
"date" : "2021-01-05T10:01:24+11:00",
"publisher" : "HL7 (FHIR Project)",
"contact" : [{
"telecom" : [{
"system" : "url",
"value" : "http://hl7.org/fhir"
},
{
"system" : "email",
"value" : "fhir@lists.hl7.org"
}]
}],
"description" : "Defines the types of relationships between actions.",
"jurisdiction" : [{
"coding" : [{
"system" : "http://unstats.un.org/unsd/methods/m49/m49.htm",
"code" : "001",
"display" : "World"
}]
}],
"caseSensitive" : true,
"valueSet" : "http://hl7.org/fhir/ValueSet/action-relationship-type",
"hierarchyMeaning" : "is-a",
"content" : "complete",
"concept" : [{
"code" : "before-start",
"display" : "Before Start",
"definition" : "The action must be performed before the start of the related action."
},
{
"code" : "before",
"display" : "Before",
"definition" : "The action must be performed before the related action."
},
{
"code" : "before-end",
"display" : "Before End",
"definition" : "The action must be performed before the end of the related action."
},
{
"code" : "concurrent-with-start",
"display" : "Concurrent With Start",
"definition" : "The action must be performed concurrent with the start of the related action."
"definition" : "The action must be performed before the related action.",
"concept" : [{
"code" : "before-start",
"display" : "Before Start",
"definition" : "The action must be performed before the start of the related action."
},
{
"code" : "before-end",
"display" : "Before End",
"definition" : "The action must be performed before the end of the related action."
}]
},
{
"code" : "concurrent",
"display" : "Concurrent",
"definition" : "The action must be performed concurrent with the related action."
},
{
"code" : "concurrent-with-end",
"display" : "Concurrent With End",
"definition" : "The action must be performed concurrent with the end of the related action."
},
{
"code" : "after-start",
"display" : "After Start",
"definition" : "The action must be performed after the start of the related action."
"definition" : "The action must be performed concurrent with the related action.",
"concept" : [{
"code" : "concurrent-with-start",
"display" : "Concurrent With Start",
"definition" : "The action must be performed concurrent with the start of the related action."
},
{
"code" : "concurrent-with-end",
"display" : "Concurrent With End",
"definition" : "The action must be performed concurrent with the end of the related action."
}]
},
{
"code" : "after",
"display" : "After",
"definition" : "The action must be performed after the related action."
},
{
"code" : "after-end",
"display" : "After End",
"definition" : "The action must be performed after the end of the related action."
"definition" : "The action must be performed after the related action.",
"concept" : [{
"code" : "after-start",
"display" : "After Start",
"definition" : "The action must be performed after the start of the related action."
},
{
"code" : "after-end",
"display" : "After End",
"definition" : "The action must be performed after the end of the related action."
}]
}]
}
Usage note: every effort has been made to ensure that the examples are correct and useful, but they are not a normative part of the specification.
FHIR
®©
HL7.org
2011+.
FHIR
Release
4
(Technical
Correction
#1)
(v4.0.1)
R5
hl7.fhir.core#5.0.0
generated
on
Fri,
Nov
1,
2019
09:32+1100.
QA
Page
Sun,
Mar
26,
2023
15:22+1100.
Links:
Search
|
Version
History
|
Table
of
Contents
|
Credits
Glossary
|
QA
|
Compare
to
R3
R4
|
Compare
to
R4B
|
|
Propose
a
change